Draft: Resolve "Document product integration for using Big Bang pipeline"
Closed
requested to merge 840-document-product-integration-for-using-big-bang-pipeline-2 into master
Changes
Changing from using .gitlab-ci.yaml
in packages to calling the pipeline in the repo's settings.
For Issue
Closes #840 (closed)
A new issue for creating a full Big Bang pipeline for packages to run should be created as per https://repo1.dso.mil/platform-one/big-bang/bigbang/-/issues/840#note_478046
Edited by razzle
Merge request reports
Activity
changed milestone to %1.23.0
assigned to @razzle
added statusreview label and removed statusdoing label
removed statusreview label
Please register or sign in to reply