Update Ironbank
This MR contains the following updates:
Complete MR checklist
Assignee
-
Followed upgrade instructions outlined in docs/DEVELOPMENT_MAINTENANCE.md -
Update Docs with new/updated steps as needed -
Tested and Validated Changes made with supporting info like logs or screenshots from test pipelines
Add supporting info below
Reviewer only
-
Tested and Validated changes
Configuration
-
If you want to rebase/retry this MR, check this box
This MR was automatically generated by Renovate Bot.
Upgrade Notices
N/A
Merge request reports
Activity
mentioned in issue #121 (closed)
added teamSecurity & Compliance label
added 5 commits
-
4eb6966c...ef9655d1 - 4 commits from branch
main
- 632e6a0c - SKIP UPDATE CHECK Update...
-
4eb6966c...ef9655d1 - 4 commits from branch
added 9 commits
-
632e6a0c...91e140ab - 8 commits from branch
main
- 5fd262c1 - SKIP UPDATE CHECK Update...
-
632e6a0c...91e140ab - 8 commits from branch
added 3 commits
-
12645301...2648e7a0 - 2 commits from branch
main
- 6f716287 - SKIP UPDATE CHECK Update Ironbank
-
12645301...2648e7a0 - 2 commits from branch
assigned to @bkhamitov
requested review from @bimbola81, @daxmc99, @jasdeep.s.basra, and @mucles
changed milestone to %2.38.0
added statusdoing label
mentioned in merge request big-bang/bigbang!5174 (merged)
added statusreview label and removed statusdoing label
mentioned in commit e5aa8613