UNCLASSIFIED - NO CUI

Skip to content

SKIP UPDATE CHECK Update Ironbank

RENOVATE_BOT requested to merge renovate/ironbank into main

This MR contains the following updates:

Package Update Change
docker.io/grafana/loki-canary patch 3.3.0 -> 3.3.1
ironbank/opensource/grafana/loki (source) patch 3.3.0 -> 3.3.1
registry1.dso.mil/ironbank/opensource/grafana/loki (source) patch 3.3.0 -> 3.3.1
registry1.dso.mil/ironbank/opensource/memcached/memcached (source) patch 1.6.32 -> 1.6.33

Complete MR checklist

Assignee

  • Followed upgrade instructions outlined in docs/DEVELOPMENT_MAINTENANCE.md
  • Update Docs with new/updated steps as needed
  • Tested and Validated Changes made with supporting info like logs or screenshots from test pipelines

Add supporting info below

Reviewer only

  • Tested and Validated changes

Important

Release Notes retrieval for this MR were skipped because no github.com credentials were available. If you are self-hosted, please see this instruction.


Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever MR becomes conflicted, or you tick the rebase/retry checkbox.

👻 Immortal: This MR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this MR, check this box

This MR was automatically generated by Renovate Bot.

Upgrade Notices

N/A

Edited by Peter Sigur

Merge request reports

Loading